Carrying a company under pressure
Start with the psychology, then the decision protocol, then the operating system.
Start this pathThe Library · Systems for the Strategic Self
Operator-grade books on founder psychology, agentic AI systems, evidence-based decision-making, and the craft of building when the stakes are high. Written to be used, not just read — with current English and Dutch editions, covers, and production files.
Three jobs people bring. The later cost Why a model does not name you What a roster is
No. 01 · Available now · RESILIENT framework
How High-Stakes Leaders Stay Grounded, Clear, and Effective Under Pressure
The RESILIENT framework treats founder resilience as trainable infrastructure: stress recognition, emotional precision, attention protection, decision architecture, recovery, and support before pressure turns into isolation.
Available now
Live titles ship on Amazon. Formats and language editions are listed on each book page. Kindle editions that are live are enrolled in Kindle Unlimited.
No. 01 · RESILIENT
How High-Stakes Leaders Stay Grounded, Clear, and Effective Under Pressure
No. 02 · SENSE
How Founders and Operators Deploy Agentic AI to Move Faster and Think Smarter
No. 03 · BooksOS
The BooksOS Method for Writing Serious Nonfiction with AI Agents
No. 04 · STACK
The Five-Layer Architecture That Makes Agent Work Survive Production
No. 05 · CHORUS
How Humans and AI Agents Share Work Without Losing the Plot
No. 06 · CALIBRATE
How to Hold Judgments at Their Right Strength Under Uncertainty
No. 08 · ROUTE
How to Route, Mix, and Govern LLMs Like a Strategic Asset Allocator
No. 09 · TRACE
Deep Online Research for Entrepreneurs Using AI Without Trusting It Blindly
No. 10 · ROSTER
Build Your Autonomous Specialist Roster for a One-Person Company
Where to start?
Start with the psychology, then the decision protocol, then the operating system.
Start this pathThe repository, the retrieval layer agents actually call, the team, and the strategy layer above them.
Grade evidence, calibrate confidence, and trace decisions past their first-order effects.
Start this pathThe complete library
No titles match this combination — try another theme or status.
One framework per book
Every title delivers one named system you can run. This is the whole series in a single column.
The wider portfolio
Every title moves through the same pipeline: research, evidence ledgers, bilingual drafting, red-team review, and gated production — the system described in The Agentic Author. A selection of what is coming next:
Working titles from the wider pipeline, with no cover and no publication date yet. Titles marked ✦ already have an English draft under way.
Ask about early access to a titleI send pre-release editions to a small group of founders, operators and builders who'll actually use them. Tell me which titles you want first.
Request early accessFrequently asked
11 titles are available now: The Psychology of Founder Resilience, AI Agents for Startup Strategy, The Agentic Author, The Agentic Codebase, The Multi-Agent Organization, The Calibrated Mind, The RAG Engineer, The Model Portfolio, The Verified Research Loop, The Agent Dream Team and The Evidence-Aware Life. Live formats and Amazon markets are listed on each book page.
Systems for the Strategic Self is an operator-grade nonfiction series on founder psychology, agentic AI systems, evidence-based decision-making, and building under pressure. 51 titles are designed and covered; the wider portfolio holds 133 active book projects. Each book delivers one framework you can run, not just read.
No. Every title is produced as two native editions with their own style profile, their own examples, and their own editorial pass. The Dutch text is not a machine translation and does not read like one.
On Amazon. One ASIN per edition resolves across marketplaces, so every book page lets you pick your own Amazon store. Live Kindle editions are enrolled in Kindle Unlimited. Titles without a Kindle edition are print only.
AI agents do specialist work inside a gated production line: research, source capture, structural review, fact-checking, and red-team critique. Judgment, voice, and accountability are human, and every claim enters an evidence ledger with a source before it reaches the page. The system itself is documented in The Agentic Author.
Desk companion
I know this page, the blog, the glossary, and the books. Ask what it means, or what to read next. I will not invent a buy button.